• Home
  • Investors
  • Contact Parker
  • Sign In / Register
Parker Community
  • Site
  • User
  • Site
  • Search
  • User
  • Products
  • Support
  • Divisions
  • Where to Buy
  • Careers
  • About Parker
Home Parker Community Technologies Hydraulics Hydraulics Blog How Maintenance Strategies Can Affect the Lifespan of Power Plant Parts
Sign In / Register

Sign In

Register

Subscribe
    RSS Subscribe by email

    Manage Email Subscriptions

Categories
  • Aerospace Blog
  • Climate Control Blog
  • Electromechanical Blog
  • Filtration Blog
  • Fluid and Gas Handling Blog
  • Hydraulics Blog
  • IoT Blog
  • Parker Indego Blog
  • ParkerStore Blog
  • Pneumatics Blog
  • Process Control Blog
  • Sealing and Shielding Blog
  • Other Groups
    • Parker Indego
      • Parker Indego Instructors
      • Parker Indego Therapists
      • Parker Indego Distributors
  • Technologies
    • Aerospace
      • Supplier Resource Center
    • Climate Control
    • Electromechanical Group
      • Parker IPS Design Center Community
    • Filtration
    • Fluid and Gas Handling
    • Hydraulics
    • IoT
      • Mobile IoT
    • Pneumatics
    • Process Control
    • Sealing and Shielding
  • Blogs
  • Forums
  • Knowledge Base
  • Home
  • All Blogs
  • Home
  • Hydraulics Blog
  • Hydraulics Forums
  • Hydraulics Knowledge Base
  • Hydraulics Members
  • Mentions
  • Tags
Related
Follow Us
  • Follow Parker Hannifin on social media

Follow Parker Hannifin on social media:

How Maintenance Strategies Can Affect the Lifespan of Power Plant Parts

Posted by Hydraulics Team on 14 May 2021

    RSS Subscribe by email
Print Friendly and PDF

How Different Maintenance Strategies Can Affect the Lifespan of Power Plant Parts - Avoid Unplanned Maintenance - Hydraulic Valve DivisionThere's more than one way to maintain an asset. Power plant and maintenance managers implement various strategies to prepare for and respond to maintenance issues. While there isn't just one correct way to maintain your machines, each solution offers its advantages and disadvantages.

Selecting your power plant system's optimum maintenance strategy can be the difference between significant downtime and smooth operation to prevent unplanned outages. Note that the best approach for some machines will be different than others. Here are the three most popular and effective strategies that power plant leaders use to maintain their equipment on the plant floor. 
 

Corrective maintenance

Often referred to as "crisis management," this type of maintenance is designed to respond to power plant equipment issues. With this kind of maintenance, repairs are completed when there is a noticeable problem with functionality or condition. For example, if a combustion turbine valve is leaking, maintenance leaders should plan an immediate repair to limit downtime. The complication with this "run-to-failure" approach is the higher probability of unplanned maintenance activities and shutdowns. This type of maintenance also encourages high replacement-part inventories, so power plants that utilize corrective maintenance need to have a high volume of spare parts. While this may not seem like the most efficient strategy, it can still be the most effective type of maintenance for specific components. 

But what does this strategy mean for the lifespan of power plant parts? Unplanned maintenance repairs are a result of parts that have gone through wear and tear. A corrective approach could be disastrous for a power plant if backup parts are not available. However, with the proper preparation, it's possible to have a seamless transition and avoid costly downtime. 

No matter what maintenance strategy your plant utilizes, having instant access to replacement parts is essential to limit downtime. Parker's Valve Service program aims to replace and refurbish aging fuel and water control valves on 7E and 7F turbines. Due to the many years of service that these valves have seen, wear and corrosion may be reducing their effectiveness.
 

Preventive maintenance

This time-based maintenance is the shift from unplanned to planned maintenance activities. While corrective maintenance is based on a reactive approach, preventive maintenance takes on a more proactive approach. Scheduled maintenance inspections are intended to reduce or eliminate machine failures on the plant floor. How Different Maintenance Strategies Can Affect the Lifespan of Power Plant Parts - Preventative Maintenance Benefits - Hydraulic Valve DivisionDepending on the frequency of the planned inspections, routine maintenance can cut downtime and lessen the severity of unplanned outages. 

Plants that utilize a preventative maintenance strategy are well prepared; however, it could result in unnecessary downtime. If machines and equipment are running efficiently, unneeded inspections can disrupt a plant's production flow. Lost uptime and revenue can be enough reason to use a different maintenance approach. 

The bright side to a preventive maintenance approach is fewer unplanned outages, which can result in less wear and tear on an asset. However, it’s important to realize that equipment can still malfunction between scheduled repairs, so it’s still safe to stock up on your parts inventory. 
 

Predictive maintenance

Predictive maintenance, also known as condition-based maintenance, is the most technologically advanced form of maintenance that replaces arbitrary inspection check-ups. Instead of planning inspections when your equipment is functioning at peak performance, predictive maintenance allows your machines to alert you when repairs are needed. Typically, this would be done by monitoring system parameters like pressure, flow rate, or temperature to look for changes over time that may indicate that a component is nearing end of life or needs repair.  

Operating costs for this type of maintenance can be expensive due to the instrumentation required to study the system, but it is likely more than offset by reducing unwarranted scheduled inspections and unplanned machine failures. However, predictive maintenance is not always worth the investment depending on the machine or equipment. 

This form of maintenance can be great for the longevity of machine parts, as the reduction of failures cuts down on repairs.
 

Preparing for planned outages

Whether planned or unplanned, outages can impact any plant. Due to the unpredictability of an unplanned outage, the proper preparation isn't often implemented. So, when a seasonal planned outage occurs, it's essential to make sure your team is ready. But how do you prepare for an outage, and what should you be thinking about?

  • Review reports for prior outages
    Looking at past reports is the first thing to do when preparing for a planned outage. The purpose of preparation is to reduce downtime and increase efficiency, so it's always a good idea to make contingency plans to learn from past issues. 

  • Perform a pre-outage data review
    It's important to evaluate your operations before the outage to see the success of your post-outage overhaul. This assessment will also help find any abnormalities that you should include in the full scope of your outage. Create an initial benchmark to compare to your post outage production. 

  • Make sure your facility is properly equipped
    After performing an in-depth evaluation of your plant floor, you'll want to make sure you have your facility equipped in advance. When you don't have the right equipment during an outage, you expose yourself to costly delays or potential injuries from using the wrong equipment. Parker can help set your plant up with spare parts for any aging assets at risk for failure. 

There are many more steps to take when preparing for a planned shutdown, so make sure you leave yourself enough time to plan. It is recommended that you begin your shutdown preparation 18-24 months prior to the scheduled shutdown. 
 

How Parker can help

Whether you are still preparing for the next planned outage or just operating your plant with one of the maintenance plans above, it is always a good idea to have spare parts on hand. And you can always rely on Parker to make that happen. For years, our goal has been to support power plants with technical and commercial information and to simplify the process of obtaining new products in the most efficient way possible. 

Replace your 7How Different Maintenance Strategies Can Affect the Lifespan of Power Plant Part - 7E and 7F Turbine Valves - Hydraulic Valve DivisionIn order to address the potential issue at hand, it is important to identify the valves that need attention. These types of aging 7E and 7F turbine valves, which have been in service for 20-30 years, need an inspection. They include:

  • Gauge selector valves
  • Fuel isolation valves
  • Water staging/isolation valves
  • Fuel distribution valves
  • Air purge valves
  • Water proportioning check valves

 


Click here to learn more and download the FREE Valve Resource Guide.

Download the free Valve Resource Guide from Parker Hannifin

 

 

 

How Different Maintenance Strategies Can Affect the Lifespan of Power Plant Parts Mitch Eichler, Applications Engineer, Hydraulic Valve Division,Article contributed by Mitch Eichler, Business Development Manager, Hydraulic Valve Division, Parker Hannifin

          Related articles:

Time to Inspect and Service Your Combustion Turbine Valves

Replace Turbine Valves to Prevent Unexpected Shutdowns on the Plant Floor

Eliminate Maintenance Concerns on Gas Turbine Fuel Control Valve

Reduced Maintenance for Dual Fuel Gas Turbines With New Check Valve Design

Preventive Maintenance vs. Predictive Maintenance

Get Started on a Best Practice Maintenance Strategy | Infographic

Categories

  • Support
  • Hydraulic Valves
  • Hydraulics
  • Condition Monitoring
  • Power Generation Technology
Latest Blog Posts
  • Tags
  • Contact author
  • Subscribe by email
  • More
  • Cancel
  • Electro-Hydraulic System is the Ideal Solution for Power Steering in Buses Bus Pump & Motor DivisionThough gas-powered, internal combustion engine driven vehicles have been the norm in the automotive industry for over 100 years, electrification is growing. The traditional engine design was efficient, reliable, and easy to use, but gasoline powered vehicles are loud, dirty, and harmful to the environment. Given these drawbacks, electric vehicles have started to gain market share in commercial and personal markets. Public transportation is moving toward electrification at a faster pace than other markets, spurred by the deployment of electric vehicles in China.

    Electrification brings new challenges

    When an electric motor is implemented, the noise created under the hood is significantly decreased. This is a huge benefit of electrically powered vehicles, but also causes noises from other systems to become noticeable. Power steering, A/C systems, and hydraulics introduce a new layer of sounds that can be annoying to drivers and riders.

    An innovative solution

    Parker’s Pump & Motor Division teamed with the Hydraulic Pump and Power Systems Division to create the Electro-Hydraulic Pump System, or eHPS. The eHPS combines the low noise performance of the PGP505H’s helicoidal design with the high performance of the GVM motor, creating a system that provides on-demand power steering, a simplified installation process, high efficiency, and quiet operation. Quiet and powerful, the eHPS is robust enough for most electric bus applications. Benefits of the eHPS include:

    • Motor, pump, tank, relief valve, filter, and inverter in one package
    • Efficiency of over 80%
    • Quiet operation of less than 57dBa
    • Built and assembled in USA

    xThe eHPS is ideal for buses and large commercial vehicles that require large amounts of hydraulic power for steering assistance, but also necessitate the quiet operation of an electric system. In addition, the eHPS has IP67 protection, is tested to SAE J1455 vehicle standards, and designed to ISO 16750 standards, making it ideal for replacement applications. Electrification is the future of the automotive industry, and public transit is leading the charge. Learn more about Parker’s innovative new product today.

    The Pump & Motor Division is a market leader in gear pump and low speed-high torque gerotor motors, that continues to blaze a trail in the industry by developing new technologies while maintaining the high level of service synonymous with Parker Hannifin. Between its two locations in North Carolina and Tennessee, the division employs decades of industry experience to better serve you and your application.

     

    Electro-Hydraulic System is the Ideal Solution for Power Steering in Buses CT Lefler Pump & Motor DivisionThis article was contributed by CT Lefler, marketing product manager (e-business), Pump & Motor Division, Parker Hannifin Corporation.

     

     

     

      Other related articles:

    Technology Trend - eSteering Enables Greener Buses and Coaches

    Global Vehicle Electric Motor Brings Efficiency and Reliability | Infographic

    New Motor and Generator Solution Supports Cleaner Vehicles of the Future

     

     

     

     

     

    Hydraulics Team
    Hydraulics Team
    • 28 May 2021
    Electro-Hydraulic System is the Ideal Solution for Power Steering in Buses
    Though gas-powered, internal combustion engine driven vehicles have been the norm in the automotive industry for over 100...
  • Learn How This Public Works Department Increased Productivity Excavator Cylinder DivisionPhil Meyer, operations manager of the Whitman County Public Works Department, in Washington State, is tireless in his search for the right tools to help his 42-person team maintain over 1,900 miles of roads and 360 bridges and large structures in Southeastern Washington. The department has a daunting workload and inclement weather that can border on the extreme, productivity, durability and versatility are critical requirements of the equipment used at Whitman County. Typical projects include ditching to maintain flow lines, culvert maintenance, placing rip-rap, brush removal, bridge demolition, gabion basket installation, sloping and more.

    Selecting the best equipment

    Meyer's search lead him to Parker, the manufacturer of the PowerTilt Tilting Coupler and PowerGrip Multi-Purpose Jaw Bucket. The construction equipment attachments were exactly what Meyer’s team needed to maintain the county road system by preventing, reducing or restoring the roadway infrastructure and for maintaining the stormwater runoff by providing proper drainage, preventing flooding and road damage. "We switched to PowerTilt from cylinder-style tilting buckets and couldn’t be happier. Our tilting buckets didn’t offer the rotation we needed and weren’t durable enough. PowerTilt provided us with greater angles of rotation and since all moving parts are fully enclosed — PowerTilt has been virtually maintenance free," states Dave Stine, Whitman County equipment operator.

    Benefits with a wide variety of maintenance projects

    Learn How This Public Works Department Increased Productivity Powertilt PowerGripCylinder Division The seven PowerTilts and their PowerGrip have been important assets for the Whitman County Public Works department. With PowerTilt and PowerGrip, the department accomplishes most tasks 25 to 50 percent faster. The Whitman County Public Works department has even recommended PowerTilt and PowerGrip to other local agencies such as the Washington State Department of Transportation and the North Latah County Highway Department in Idaho.

    The Whitman County Public Works team explained that PowerTilt is extremely effective for shoulder maintenance tasks. Great care is required when ditching and sloping next to fragile habitats and consideration must be paid to the most effective water runoff target zones. The main objective is to provide shoulder stability by creating a smooth transition from roadway surface to shoulder. By utilizing PowerTilt, with 180-degree of smooth rotation, the equipment operator can work primarily from the road surface, diminishing the impact on sensitive roadside vegetation and habitats meanwhile producing the clean “V” shaped ditches the department requires.

    When working on a culvert project, PowerTilt virtually eliminates the need for back-breaking manual labor. The PowerTilt is used to angle the bucket to dig around both sides of the pipe. Once the soil is loosened around the pipe, the equipment operator can hook the end of the pipe and lift it right out. With the utilization of a PowerTilt, labor intensive, time-consuming digging by hand is eliminated.  Often, using the attachments, most tasks can be accomplished by an equipment operator and a truck driver resulting in efficient utilization of resources.

    PowerGrip has proven very helpful in placing rip-rap around bridges as well as for removing the old wooden pilings. PowerGrip has also made life easier when it comes to removing brush and trees from the roadside and right-of-ways. The multi-purpose tool eliminates the need to switch attachments between tasks.

    The rotary actuator technology

    Learn How This Public Works Department Increased Productivity rotary actuator Cylinder DivisionPowerTilt uses Parker’s innovative sliding-spline operating technology to convert linear piston motion into powerful shaft rotation. Each actuator is composed of a housing and two moving parts — the central shaft and piston. As hydraulic pressure is applied, the piston is displaced axially, while the helical gearing on the piston outer diameter and housing’s ring gear cause the simultaneous rotation of the piston. PowerTilt's end caps, seals and bearings all work in tandem to keep debris and other contaminants out of the inner workings of the actuator.

    Engineered for Durability and Performance

    Learn How This Public Works Department Increased Productivity Powertilt Cylinder DivisionOver a decade of research, innovation and engineering has gone into making the PowerTilt and PowerGrip attachments integral solutions for work site efficiency. PowerTilt’s robust design has allowed Whitman County Public Works to keep a PowerTilt on their machine 100 percent of the time, year-round.  

    PowerTilt is available for equipment up to 75,000 pounds in eight sizes with standard rotation of up to 180 degrees. Each model is designed for a specific class of machinery and individually customized to fit the carrier. PowerGrip buckets are available for equipment up to 20 tons, in three sizes, with bucket width ranges from 24 inches to 48 inches in the trenching profiles and 48 inches or 60 inches in the ditching profiles.

    Within the construction industry, PowerTilt and PowerGrip have built a reputation for their versatility, durability and efficiency – learn more today http://solutions.parker.com/powertilt

     

    Learn How This Public Works Department Increased Productivity Jessica Howisey CYLLearn How This Public Works Department Increased Productivity - Dan Morgado - Parker Cylinder DivisionThis article was contributed by Jessica Howisey, marketing communications manager and Daniel Morgado, applications engineer, Helac Business Unit, Cylinder Division.

     

     

     

     

    Related articles:

    PowerTilt Reduces Manual Labor, Lowers Costs and Increases Operator Safety

    Unique Tilting Coupler Technology Gives Construction Firm Competitive Edge

    Productivity Improved with Multi-Purpose Jaw Bucket

    Highway Department Benefits From PowerTilt and PowerGrip In Idaho

    Hydraulics Team
    Hydraulics Team
    • 20 May 2021
    Learn How This Public Works Department Increased Productivity
    Phil Meyer, operations manager of the Whitman County Public Works Department, in Washington State, is tireless in his search...
  • Hydrostatic Pumps and MotorsGold Cup Heavy-Duty Pumps and Motors have long been respected in the industry for technical excellence in hydrostatic transmission applications in marine, drilling and shredding applications, among others.

    You are also probably aware that the heavy-duty Gold Cup series of pumps and motors represent Parker's and Denison's combined expertise in hydrostatic transmission applications.

    Their tried and true design incorporates features such as, integral servo and replenishing pump, hot oil shuttle, and a unique servo control system; all of which combine to provide a rugged self-contained package that can withstand the harshest of conditions and continue to perform with trouble free long life.

    But you may not be aware of Gold Cup's, heavy-duty hydrostatic piston pump and motor value-added features and benefits listed below: 

    • Precise, tight control only results in a 4-5% change in control between motoring and pumping, versus the typical competitor product change of 10%. 
    • Displacement control response can ramp up from 0 to 695 hp in 300 ms. 
    • Automated brake and bypass control provides smoother stop and start transitions, reducing the operator burden. 
    • Pressure compensator response reduces heat and results in an 80% reduction in system shock.
    • 70% longer life than a typical hydrostatic pump. Since Gold Cup's inception over 50 years ago, these first generation pumps and motors are still in use. 
    • Numerous certifications and qualifications ranging from military grade to ATEX.

    For more details, check out Parker's Hydraulic Pump and Power System's You Probably Didn't Know About Gold Cup infographic.  

    Hydrostatic Pumps and Motors

          Related Links

    Hydraulic Pumps on the Krumbuster Help Revolutionize Crumb Rubber Production

    High Performance Hydraulic Pumps and Motors Expand Production in Lumber Mill

    Infographic: 5 Benefits of Smart Technology in Extreme Duty Hydrostatic Pumps



     

    Hydraulics Team
    Hydraulics Team
    • 17 May 2021
    6 Things You Never Knew About Heavy Duty Hydrostatic Piston Pumps and Motors
    Gold Cup Heavy-Duty Pumps and Motors have long been respected in the industry for technical excellence in hydrostatic transmission...
  • Other Groups
    • Parker Indego
      • Parker Indego Instructors
      • Parker Indego Therapists
      • Parker Indego Distributors
  • Technologies
    • Aerospace
      • Supplier Resource Center
    • Climate Control
    • Electromechanical Group
      • Parker IPS Design Center Community
    • Filtration
    • Fluid and Gas Handling
    • Hydraulics
    • IoT
      • Mobile IoT
    • Pneumatics
    • Process Control
    • Sealing and Shielding
  • Home
  • All Blogs
  • Home
  • Hydraulics Blog
  • Hydraulics Forums
  • Hydraulics Knowledge Base
  • Hydraulics Members
  • Mentions
  • Tags
Follow Us
  • Follow Parker Hannifin on social media

Follow Parker Hannifin on social media:

Parker Hannifin Parker Hannifin

  • Products
  • About Parker
  • Investors
  • Community
  • Careers

Global Operations Global Operations

  • Divisions
  • Sales Companies
  • Worldwide Locations
  • Distribution Network
  • ParkerStoreā„¢ Network

Company Information Company Information

  • Newsroom
  • Event Calendar
  • Working with Parker
  • Product Brands
  • History

Global Support Center Global Support Center

  • Support
  • CAD
  • Where to Buy
  • Contact Parker
  • Manage Online Orders
Parker - Engineering Your Success
  • Site Map
  • Safety
  • Privacy Policies
  • Terms and Conditions
Ā© Parker Hannifin Corp 2021